Major Trenching & Backfilling works completed since 2000

Name of the work Pipeline(s) Diameter Trench Length(KM) Year Client
Submarine pipeline projects, Deen Dayal Field Development Project 20'' & 10'' 21.50 On goingPunj Lloyd Limited
Submarine Pipeline Project (Mynmar- China Pipeline Project) 40", 32" & OFC 5.8 2012Punj Lloyd Limited
Composite work for laying LPG Pipeline (onshore & offshore) from BPCR /HPCR to Uran 10.75" & OFC 11.85 2012Punj Lloyd Limited
SHWE Project, Myanmar 32" 2.92 2012Hyundai Heavy Industries
Trenching and back filling for IOCL 3 X 48" 1.40 2011Hyundai Heavy Industries
Mundra Trenching and Back filling 48" 2.7 2010Valentine Maritime Maritius Ltd.
Uran- Trombay Gas Pipeline near Mumbai, India 20" 16 2008Punj Lloyd Limited / ONGC, India
South Sumatra West Java Gas Pipeline Project. Phase-I 32" 6.9 2006Nippon Steel Corporation / PGN, Indonesia
Uran- Trombay- Jawahardweep - 36” Crude Oil Pipeline near Mumbai, India 36" 20 2006Punj Lloyd Limited / ONGC, India
NEAD Project, Abu Dhabi 14", 12", 8" & OFC 11 2005NPCC / Technip
Tunu Field Development Project Phase 9, Indonesia 20" 6 2004PT Punj Lloyd Indonesia / TOTAL E&P Indonesia
Hazira Offshore Development – Niko Resources, India 12" 2 2004Niko / Clough Offshore, Australia
Panaran Pemping Gas Pipeline Project, Indonesia 26" 10 2003PT Punj Lloyd Indonesia / PGN, Indonesia
Backfilling for Tunu Phase 8 Project, Indonesia. 24" 2.5 2003TOTAL E&P / PT Punj Lloyd, Indonesia
Hazira Offshore Development – Lakshmi Fields, India 20" 2 2002Cairn Energy / Hyundai
Pirpau Jetty to Jawahardweep Submarine Pipelines (MOT), India 6 X Max 42" 4 2000Hyundai / Mumbai Port Trust