Major Dredging & Reclamation works completed since 2000

We are one of just a few engineering companies to offer a dedicated group of experienced professionals focused on dredging, dredged material disposal, and land reclamation work. Our staff expertise comes from decades spent in the industry—planning, designing, and executing some of the largest, high-profile dredging and land reclamation projects to date.

Name of the work Quantity (M3) Year Client
Dredging and Reclamation work (Phase II)
for IOCL Paradip Refinery Project
10,500,000 2011 Indian Oil Corporation Limited, New Delhi
Dredging & Reclamation Works for Gas Terminal Site near Mallavaram, Dist. East Godavari, Andhra Pradesh 450,000 2011 Gujarat State Petroleum Corporation Ltd. Gandhinagar
Maintenance Dredging at Mumbai Navy 1,450,000 2011 Western Naval Command, Navy, Mumbai
Dredging and Maintenance Dredging of the River Koshi 250,000 2011 Eastern Embankment Works Division, Birpur, Bihar
Dredging and Maintenance Dredging of Gantak River (KM117.05 to 124.25 KM) 415,300 2011 Government of Water Resources Department, Bihar
Dredging and Maintenance Dredging of Gantak River (KM142.7 to 152.0 Km) 341,295 2011 Government of Water Resources Department, Bihar
Hiring of Dredger for Carrying out Dredging at Karaikal Port 1,200,000 2010 Marg PVT Ltd., Chennai
Dredging & Reclamation Works for Gas Terminal Site near Mallavaram, Dist. East Godavari, Andhra Pradesh 2,500,000 2010 Gujarat State Petroleum Corporation Ltd., Gandhinagar
Advance Dredging Works in GSL Waterfront for Modernisation Project 350,000 2010 Goa Shipyard Ltd., Goa
Dredging for Forming of Turning Circle and Approach Channel for the deep water berth at Hazira 9,100,000 2010 Essar Bulk Terminal Ltd., Hazira
Maintenance Dredging 2009 at EPL 403,000 2009 Ennore Port Limited, Chennai.
Dredging of harbour basin during 2008 at Ennore Port 2,930,000 2009 Ennore Port Limited, Chennai.
Dredging and reclamation work at specified location at proposed Pellet Plant, Paradip 250,000 2009 Essar Projects (I) Limited, Bhubaneswar.
Dredging and reclamation work at specified location at proposed Pellet Plant, Paradip 850,000 2008 Essar Steel Orissa Limited, Bhubaneswar.
Capital Dredging and reclamation at Krishnapatnam Port 7,000,000 2008 M/s Navayuga Engineering Company Ltd., Hyderabad
Development of Second Container Terminal at Chennai Port 150,000 2008 ITD Cementation India Ltd., Kolkata.
Dredging in sea water intake channel at 2X125 Mw at Akrimota TPS 106,000 2008 Gujarath Maritime Board, Jamnagar
Dredging and filling at Mayur Vihar Link Road, Noida. 444,302 2007 Mayur Vihar Link Road Project, Noida.
Dredging infront of Jetty and reclamation work at Essar Jetty. 145,000 2007 Essar Steel Ltd, Hazira.
The additional area of maintanence Dredging at LoLo Basin at LoLo Jetty in Reliance Port, Jamnagar Complex. 100,000 2007 Reliance Ports & Terminals Ltd, Jamnagar.
Supply of Cutter Suction Dredgers for dredging of River Rupnarayan at dolphin of Intake Pump House at Kolaghat Thermal Power Station 17 Months 2006 West Bengal Power Development Corporation Ltd. Mecheda.
Capital Dredging at the Navigation channel which include 5 KM long sand bar (Kharo Creek) at Sanghi Port. 4,000,000 2005 Sanghi Industries Ltd, Kutch.
Capital Dredging in Edapallikotta – Kollam stretch of National Water Way 3 170,000 2005 Inland Waterways Authority of India, Noida.
Capital Dredging in Kayamkulam-Edapallikitta stretch of National water way 3 370,000 2005 Inland Waterways Authority of India, Noida.
Desilting of Rihand Intake Channel 131,000 2005 National Thermal Power Corporation Ltd., Rihand Nagar.
Maintanence Dredging of LoLo Basin at LoLo Jetty in Reliance Port, Jamnagar Complex. 200,000 2005 Reliance Ports & Terminals Ltd., Jamnagar,
Dredging and Reclamation work at Port of Kasab in Sultanate of Oman 2,247,167 2004 Galfar Engineering & Contracting L.L.C., Oman.
Dredging in front of berth no. 4A Jetty at Haldia Dock Complex. 90,000 2004 International Sea Port (Haldia) Port Ltd., Haldia
Dredging of sand across river Krishna of Srisailam Dam. 50,820 2004 Patel Engineering Ltd., Hyderabad
Dredging in front of berth no. 4A Jetty at Haldia Dock Complex. 73,500 2003 International Sea Port (Haldia) Port Ltd., Haldia
Hydraulic dredging of Oil jetty at Paradip. 1,512,363 2003 Paradip Port Trust, Paradip.
Hydraulic filling through dredging from Yamuna River bed including compaction 600,000 2002 Delhi Jal Board through Simplex Concrete Piles (India) Ltd., New Delhi
Dredging anf filling of sand in Embankment for construction of road for approaches to the Delhi Noida Toll Bridge. 1,750,000 2001 Oriental Structural Engineers Ltd., Noida.
Dredging in Boat basin of 2nd stage fishing harbour at Malpe 247,000 2001 Ports and Fisheries Division, Udupi.
Dredging in the Port of Dharmatar Creek with partial Hard Soil 1,567,000 2001 Maharashtra Maritime Board, Mumbai.
Dredging of 2nd Multipurpose cargo berth and western quay at Paradeep Port. 600,000 2001 Paradip Port Trust, Paradip
Dredging infront of Deep Water Berth and turning circle at Porbandar Port using Grab Dredger and transportation and disposal by Hopper Barges. 127,200 2000 Gujarat Maritime Board, Jamnager